En
|
Fr
Home
Services
43-101
Expertise
Mining properties
Pre-feasibility studies
Consulting
Design & Realisation
Design factory mining
Realisation & engineering
Main activity
Mines
Geology
Metallurgy
Projects
Contacts
Mines
More than 30 years of mining experience
Studies
A team of highly qualified managers
Productivity
Guarantee high standards of productivity for optimum mining operations
Environmental Impact
Environmental impact is at the heart of our studies
BUMIGEME Projects and Realisations
Front End Engineering Design of the concentrator for ore processing of the polymetallic mine of Beqtaqari, 1500t / d, Georgia 2.26 MT (Eastern Europe)
Feasibility study of the Rose Lithium deposit, 5000t / d, 26.8MT, Quebec
NI 43-101 Feasibility study works for Bektakari deposit project Bolsini, Georgia
Preliminary Economic Assessment for a Lithium deposit, La Motte, Canada
Feasibility Study NI 43-101 for a gold deposit, Kobada, Mali
Feasibility Study for Lithium-Tantale Plant, in Rose project, Canada
Detailed Engineering and Construction Management for a Pilot Gold Plant, Kobada, Mali
Detailed Engineering and Construction Management for a Gold Plant, Kodieran, Mali
Technical / Economic study of the Mostaganem and Maghnia bentonite deposits
NI 43-101 feasibility study, engineering and commissioning a processing gold plant
Preliminary Economic Assessment, Lac Rocher Nickel Project, Canada
Detailed Engineering and Construction Management for a Pilot Gold Plant, Kodieran, Mali
Feasibility Study for a zinc flotation concentrator, Abcourt-Barvue, Canada
Pre-feasibility Study for Lithium deposit in La Motte, Canada
Process development and preliminary engineering for a gold deposit, Morocco
Pre-feasibility Study for Potosi Tailings Retreatment Project, Bolivia
Pre-feasibility study for Barite and Zinc Project of Upton Quebec, Canada
© 2011 BUMIGEME.INC Copyright