img

Projects :

Date of Realization

Preliminary Economic Assessment 2012 -In progress

Minerals :

Lithium

Geographic Location

La Motte, Canada

Description :


   BUMIGEME’s mandate for a Preliminary Economic Assessment (PEA) focuses on increasing the processing capacity of the plant to 2,000 tpd, and evaluation of the investment and operating costs, with an accuracy of ± 35 %. The pre-feasibility study for Raymor Resources in 2000 was for a 687 tpd plant.

   Elements that will be included in the study are mainly:
  • The processing plant
  • Infrastructure (water and energy needs)
  • Services (laboratory)