Technico-economic studies based on NI 43-101 standard
Call us 438-798-0582
BUMIGEME offers its expertise in mining engineering in most countries.
Conducting a NI 43-101 technical and economic study
Our experts are qualified to carry out preliminary, pre-feasibility, and feasibility technical and economic studies under Canadian standard NI 43-101.
These studies will determine the viability of your mining project and will serve as essential tools for obtaining eventual project financing.
Depending on the type of study, the following elements will be discussed
- Geological Resources;
- Mineral reserves;
- Optimal mining method;
- Optimal processing method;
- Capex and Opex;
- Financial analysis and sensitivity ;
- Environmental study and social acceptability;
- Market study.
Metallurgy and plant design and construction (EPCM contract) are also part of our fields of expertise.
The realization of these studies will make it possible to evaluate the relevance of the continuation of your project
- Preliminary study
- Pre-feasibility study
- Feasibility study
- NI 43-101 compliance
- Mining operations
- Ore processing
- Process optimization
- Financial analysis
- Plant construction
- 30 years of experience
- Solid expertise
- Team of qualified engineers
- Respect for the environment
In most countries of the world
Contact us
To determine the feasibility of a mining project, rely on our mining engineering expertise.